How to prepare an investment in accordance with environmental requirements?

Preparing an investment project in accordance with environmental requirements primarily involves completing several legal and administrative procedures. These procedures allow the project to avoid potential financial penalties for failure to comply with applicable regulations, while also limiting the project's negative impact on the natural environment.

Environmentally compliant investment – ​​step by step

There are at least several stages that an investment must go through before it reaches its completion. Specialists should assist in guiding the entire process – experienced advisors, lawyers and people familiar with national and European environmental regulationsBelow, we describe the most important steps you need to take in this process.

  1. ### Determining the classification of the project

Polish law divides investments into two groups – always significantly affecting the environment and potentially significantly affecting the environment.

Projects classified in the first group require an environmental impact assessment, which must be used as a basis for a detailed report. Such investments include, among others, the construction of highways and industrial plants.

The second group includes projects that are subject to the preparation of a Project Information Card and must go through the procedure of applying for decisions on environmental conditions based on it. During this procedure, officials decide whether the investor will require a submitted Project Information Card to issue a decision or whether a full report is required, just as in the case of investments belonging to the first group.

  1. ### Preliminary documentation, consents and permits, environmental decision

Once the project classification has been determined, the investor must take care of the formalities. This includes preparing the aforementioned Report and/ or Project Information Card (KIP).

The next step will be obtaining an Environmental Conditions Decision, which is issued based on an application submitted by the commune head, mayor, or city president. In some cases, public consultations are held before the decision is issued. During these consultations, residents of the areas where the investment is planned, as well as environmental organizations, can submit comments and complaints.

In addition, the necessary approvals and permits must be obtained. Their type depends on the specific project, but most often they include documents such as:

  • decision to exclude land from agricultural or forestry production,
  • water permits,
  • tree removal permits,

Every consent is preceded by an application, which must be duly documented. Therefore, knowledge of current regulations and administrative procedures is crucial.

  1. ### Supervision over the implementation of the project

After completing the documentation and obtaining permits, the investor must focus on supervising the construction and then operation of the investment.

From a legal point of view, it is of particular importance compliance with the recommendations of the environmental decision including the implementation of requirements imposed in the form of a post-implementation analysis, which may include a requirement to carry out measurements, for example of the generated noise.

Environmental requirements – how to meet them?

Consulting companies can help you meet environmental requirements, which specialize in advising during the planning and implementation stages of investments. Their focus includes environmental requirements and the aforementioned procedures.

Thanks to the expertise of these specialists, the investor can properly prepare for the entire project and, as a result, meet the requirements of national and European regulations. This is one of the key advantages of environmental outsourcing. It is used by both small and medium-sized companies and large enterprises.