Do you run a production plant and do not know whether you comply with all your environmental protection obligations in accordance with the law? Or maybe you are just considering starting an industrial activity? Check how many aspects a professional consulting company can help you with.
Choosing a plot for an investment - how to do it right?
Choosing a plot is one of the first steps that an entrepreneur must take to be able to start his own plant. Unfortunately, it happens that the land that met the investor's expectations at first glance turns out to be a poor investment in reality. To avoid surprises, before buying, you should:
- check the plot in the Local Spatial Development Plan or Study – thanks to this, you will determine whether it is possible to locate the planned investment in a given area,
- order a soil survey – you will find out from them whether the plot is not polluted. This will protect you from the costs associated with possible remediation (soil clearance), and will also allow you to make an objective decision on the purchase of the plot. If you decide to purchase land that needs clearing, you may need a remediation plani.
Investment stage - steps and environmental formalities that the investor must not forget
An entrepreneur who intends to build or expand his own plant must complete many formalities. Otherwise, his actions will be illegal. Contrary to appearances, a building permit alone is not enough. In many cases, before an investor starts applying for them, he must obtain decision on environmental conditions. It determines whether the project can be approved for implementation in the indicated location due to its future impact on the environment.
It may also turn out that the application for a decision on environmental conditions you will need to join:
- documentation based on the inventory of trees and shrubs,
- geotechnical opinion,
- elaboration on natural inventory (inventory of fauna and flora).
But that's not the end. If the facility will use wells or discharge rainwater into environment, e.g. channel or ditch, it may be necessary obtaining a water permit. On the other hand, in the case of driveways and car parks where cars will move, assembly is often required separator of petroleum substances. It happens that the entrepreneur also has to invest in a sewage treatment plant.
Operation stage - environmental obligations of the entity using the installation/device
Not only the investment stage requires the entrepreneur to complete a number of formalities. Also, the operation of the installation and devices is hedged with a lot of environmental regulations that must be strictly observed. It is necessary, among other carrying out preliminary measurements z installation, if it requires a permit.
Moreover, the entrepreneur is obliged to formal and legal regulations (by obtaining relevant decisions within sector use of the environment), If:
- generates waste in installations in quantities exceeding the indicated thresholds,
- processes or collects waste,
- emits gases and dusts into the air from installations and devices in a way forced by mechanical ventilation,
- collects surface or underground water,
- discharges rainwater and snowmelt into the environment or wastewater containing particularly harmful substances to the sewage system of another plant or institution.
In the case of installations that are characterized by high production capacities per day, it may be necessary obtaining an integrated permit. If the plant is built from scratch, the "Initial Report" must be attached to the application for an integrated permit.
Some entrepreneurs are also obliged to conduct preliminary, periodic or continuous measurements. In order to realize it task, need to do installation of measuring connectors, and sometimes Additionally – that the measurements are made with accreditation – overlay on the emitter. Most entities are also required to record and report (FEES FOR USE OF THE ENVIRONMENT, BDO, KOBiZE, GUS). It must also take into account the likelihood of VIEP inspection and the need to implement post-inspection recommendations.
An entrepreneur who intends to build, expand or buy a production plant must meet a number of requirements and complete many formalities. In all these matters, he can count on support from environmental consulting specialists. It will facilitate the fulfillment of the obligations imposed on the entity in connection with the implementation of the investment project. It will also save time, money and nerves.